Drogheda Active Travel Schemes Phase 3

Dúnta18 Fea, 2024, 11:59pm - 1 Már, 2024, 5:00pm

Primary tabs

                               

 Louth County Council

Drogheda Active Travel Schemes Phase 3

Non-statutory Public Consultation on Emerging

Preferred Options

Louth County Council wishes to invite members of the public to participate in the non-statutory Public Consultation on the Emerging Preferred Route for Drogheda Active Travel Schemes - Phase 3, which incorporates Active Travel facilities along:

  • R168 Collon Road & R166 Northern Cross Route, (from Cement Rd northwards towards Hill of Rath Roundabout and east towards Rosehall Hall Roundabout) in Drogheda, Co. Louth
  • R132 Dublin Road, (from MacBride Train Station to Southgate Roundabout) Drogheda, Co. Louth

This consultation period will run from Monday 19th Feb to Friday 1st Mar 2024.

The project information, including study area maps and typical proposals, can be found on the consultation portal available from 19th February 2024 at:

https://consult.louthcoco.ie/en/consultation/drogheda-active-travel-schemes-phase-3

An in-person consultation event where the public can meet with the design team, will be held at the Drogheda Library Stockwell Lane on Thursday 22nd of February from 3pm to 7pm.

If you would like to make a submission, please do by pressing the MAKE A SUBMISSION tab on the top right of this page by 5 pm on Friday 1st March 2024